MAIN BUSINESS?
若古嘎特芒嘎雷項(xiàng)目(Rahughat
Mangale)位于尼泊爾西部開發(fā)區(qū)的Myagdi地區(qū),總投資5500萬(wàn)美元,設(shè)計(jì)引用流量12.0m3/s,裝機(jī)2臺(tái),總裝機(jī)容量35.5MW,多年平均發(fā)電量2.031億kW.h。項(xiàng)目由尼泊爾當(dāng)?shù)劂y行提供貸款,目前開展順利,總進(jìn)度已完成75%,預(yù)計(jì)在2025年上半年前達(dá)到商運(yùn)條件。
More>>
若古嘎特芒嘎雷項(xiàng)目(Rahughat Mangale)位于尼泊爾西部開發(fā)區(qū)的Myagdi地區(qū),總投資5500萬(wàn)美元,設(shè)計(jì)引用流量12.0m3/s,裝機(jī)2臺(tái),總裝機(jī)容量35.5MW,多年平均發(fā)電量2.031億kW.h。項(xiàng)目由尼泊爾當(dāng)?shù)劂y行提供貸款,目前開展順利,總進(jìn)度已完成75%,預(yù)計(jì)在2025年上半年前達(dá)到商運(yùn)條件。
Rahughat Mangale hydropower project is located in the Myagdi district of the Western Development Region in Nepal. The total investment for the project is 55 million US dollars, with a designed discharge of 12.0m3/s and equipped with 2 units, installed capacity of 35.5MW. The project's average annual electricity generation is estimated to be 20.31 million kWh.
Loan for the project is provided by local banks in Nepal. Currently, the project is progressing smoothly, with 75% of the overall progress completed. It is anticipated to achieve commercial operation status by the first half of 2025.