MAIN BUSINESS?
龍頭灘電站位于四川省阿壩州馬爾康縣沙爾宗鄉(xiāng)境內(nèi),馬爾康市北部足木足河支流茶堡河下游溝口河段,建壩高8~9m,毛水頭150m,凈水頭141.0m,引用流量40m3/s。距縣城約50Km,與縣城至大藏鄉(xiāng)公路相交,交通方便。
More>>
龍頭灘電站位于四川省阿壩州馬爾康縣沙爾宗鄉(xiāng)境內(nèi),馬爾康市北部足木足河支流茶堡河下游溝口河段,建壩高8~9m,毛水頭150m,凈水頭147.5m,引用流量23m3/s。距縣城約50Km,與縣城至大藏鄉(xiāng)公路相交,交通方便。裝機(jī)容量1×24MW混流式機(jī)組,其多年平均發(fā)電量為12433萬(wàn)kW·h,年利用小數(shù)5180h,靜態(tài)總投2.3億。電站2010年經(jīng)過(guò)阿壩州發(fā)改委核準(zhǔn)后開(kāi)工建設(shè),2018年8月工程建設(shè)完成于并投產(chǎn)發(fā)電。目前,主要向州電網(wǎng)公司供電,爭(zhēng)取最終向國(guó)網(wǎng)省公司供電。
Longtoutan hydropower Station is located in Shaerzong Township, Maerkang County, Aba Prefecture, Sichuan Province, at the lower reaches of the Chabao River, a tributary of the Zumuzu River in the northern of Maerkang County. The dam is 8-9m high, with the gross head is 150m, and the net head is 147.5m. The generation flow rate is 23m3/s. It is about 50km away from the county, and intersects with the highway from the county to Dazang Township, and also have convenient transportation. With an installed capacity of 1×24MW mixed-flow unit, its annual generation capacity is 124.33 million kW·h, the annual utilization fraction is 5180h, and the static total investment is 230 million. Construction of the power station was started in 2010 after being approved by the Development and Reform Commission of Aba Prefecture. In August 2018, the construction of the power station was completed and put into operation for power generation. At present, it mainly supplies power to the state grid company, and strives to eventually supply power to the state grid provincial company.